Berkeley Marina Double Tree Hotel Project
From 1990 until the present, A Cut Above removed wallpaper, installed new wallcoverings , tiled and painted literally thousands of hotel rooms.
We also have refurbished dozens of banks, furniture stores and retail stores along with hospitals, retirement homes, medical and dental offices.
We have redecorated numerous commercial offices and buildings. Our projects are too many too list so below are a few to illustrate the types of projects we have completed.
In 1998 A Cut Above and a crew of 10 installers installed multiple corridors, suites, conference rooms and the common areas of this 368 room hotel .
Lake Tahoe Vacation Resort . A Cut Above with a crew of 4 installed wallcovering in every room in this hotel and every corridor and common area in 1998.
It was new construction , El Niño year , 6 feet of snow on the ground . The project took us 4 months x 7 days a week to complete, we finished at midnight the night before the grand opening.
Throughout 1995-1997 A Cut Above and a crew of up to 10 installers installed all the suites and common areas in this 250 room hotel.
In the early 2000's A Cut Above installed linen fabric on the walls of every corridor of this 20 story downtown Oakland retirement home.
In the early 2000's A Cut Above installed wallcovering in most of the suites in this 266 room hotel . Embassy Suites Milpitas Ca .
Throughout the mid 1990's A Cut Above and a crew of up to 10 installers installed the wallcovering in every room and corridor and common area of this hotel .
At the time it was the Berkeley Marina Marriott.
In the early 2000's A Cut Above refurbished, painted and wallpapered numerous water damaged rooms and offices in this beautiful hotel .
Between 2003 - 2007 A Cut Above with a crew of up to 12 installed the wallcovering on all the walls in every bedroom, living room and bathroom suite in this 400 room hotel on all 9 floors of this building .
We also installed the wallcovering in all the common areas.
Over a 10 year span from the mid 1990's to the early 2000's A Cut Above installed almost every inch of this hospital from common areas to corridors ,
E.R. To the ICU, the corridors to the offices . Patient rooms and common areas.
During the late 1990’s and early 2000’s A Cut Above and their team
installed wallcovering in the guest bedrooms and bathrooms and the conference rooms of what was then the Pleasanton Holiday Inn Hotel.